Skip to content

Savings simulator

Estimate What Your Sites Could Save

Enter five figures about your sites. The savings rates come from published industry studies, and you choose how cautious the estimate should be.

Start from an example site

3
100
€10,000
€500,000
€450,000
How cautious should the estimate be?

Potential savings per year

€1,158,000

Less downtime (30%)
€900,000
Energy (10%)
€150,000
Maintenance (8%)
€108,000

An estimate from published benchmarks, not a quote or a guarantee. Savings are shown before the cost of the service. Your assessment replaces these rates with figures measured on your own sites.

Book an assessment

Where the Rates Come From

Each rate is taken from a published range. The studies describe condition-based and predictive maintenance and better use of controls in general, not SmartConnect deployments specifically.

SavingConservativeTypicalMaturePublished range and source
Unplanned downtime10%30%50%
  • 5% to 20% less facility downtimeDeloitte, Predictive maintenance: Deloitte's approach (2022)
  • 30% to 50% less machine downtimeMcKinsey, Manufacturing: Analytics unleashes productivity and profitability (2017)
Energy5%10%20%
  • 5% to 20% on energy bills from better operation and maintenance, without significant capital investmentUS Department of Energy, O&M Best Practices Guide
  • For buildings, 29% on average from full use of controls, and 4% to 19% in buildings that are already efficientPacific Northwest National Laboratory, building controls study (2017)
Maintenance5%8%12%
  • 5% to 10% lower overall maintenance costDeloitte Analytics Institute, Predictive Maintenance position paper
  • 8% to 12% saving for predictive over preventive maintenanceUS Department of Energy, O&M Best Practices Guide

How the Estimate Is Calculated

  • Downtime: sites × hours of unplanned downtime × cost per hour × downtime rate.
  • Energy: sites × energy bill × energy rate.
  • Maintenance: sites × maintenance budget × maintenance rate.

If You Do Not Know Your Cost of Downtime

Published figures describe large plants and vary enormously by sector, so use them only as an upper reference. Siemens, The True Cost of Downtime 2024 reports about $36,000 per hour in consumer goods and $2.3 million per hour in automotive, and puts the average large plant at 27 hours of unplanned downtime a month. Smaller sites, buildings and public infrastructure are usually far below these figures, which is why the example values here are modest.

What Each Example Site Assumes

Each example describes one site, with figures per site. Where a published benchmark exists the figure is derived from it; the others are illustrative orders of magnitude, not statistics.

SectorExample siteSitesDowntimeCost per hourEnergyMaintenanceBasis
MunicipalitiesA town's public buildings and pumping stations2020 h€1,000€60,000€30,000Illustrative. Water and wastewater plants are typically a municipality's largest energy users: US EPA, Energy Efficiency for Water Utilities.
Critical infrastructureSites that must stay in service, with standby power108 h€20,000€200,000€80,000Illustrative. Few hours of downtime, at a high cost per hour.
Energy & UtilitiesPumping stations and substations1515 h€5,000€120,000€40,000Illustrative. Energy can reach 40% of a drinking water system's operating costs: US EPA, Energy Efficiency for Water Utilities.
ManufacturingA mid-size plant3100 h€10,000€500,000€450,000Maintenance is 3% of an assumed €15 million replacement value; the usual range is 2% to 5%. Downtime and energy are illustrative and set well below the large-plant figures in Siemens, The True Cost of Downtime 2024.
Smart BuildingsAn office building of 10,000 m²520 h€1,000€240,000€400,000Energy is derived: 95 kWh of electricity and 120 kWh of gas per m² a year (CIBSE TM46 general office benchmark) at €0.18 and €0.06 per kWh (Eurostat non-household prices, first half 2026). Maintenance is 2% of an assumed €20 million replacement value; the guideline is 2% to 4% (US National Research Council). Downtime is illustrative.
Transportation & LogisticsA depot or warehouse430 h€8,000€150,000€100,000Illustrative.
Healthcare & Assisted LivingA 200-bed hospital110 h€5,000€560,000€1,000,000Energy is derived: about 6,000 kWh of electricity and 29,000 kWh of heat per bed a year (Energies, 2018, energy consumption in German hospitals), heat priced as gas, at the same Eurostat prices. Maintenance is 2% of an assumed €50 million replacement value (US National Research Council). Downtime is illustrative.

Find Out What Your Sites Could Save

In a call, an engineer reviews your sites and priorities and tells you where the savings are likely to be. No preparation needed.